Is it Possible to Remove End Dates Via Import in RP?
Is it possible to remove a date from an existing record in ResearchPoint using an import file? I am trying to remove an End Date from an existing address in order to reactivate the address (i.e. the person moved back to an old address). Leaving the value as NULL or a blank space in the import file resulted in ResearchPoint setting the End Date to the existing value. That value can be manually removed in a batch, but I'd like to be able to do so automatically.